this week was spent fixing all the wall in the desired slots and screwed in place using a drill cordless drill and and posi drive then we went on to the architrave which is the  piece that goes around the edges of the windows they are all cut at 45 degrees angles and made to fit similar to the one featured
on the right



also the skirts were to be measured and cut to the right length before they were fixed how ever these were just square cuts like this one featured below these ran along the whole bottom of the sleep out and  along the tops aswell

1 comment:

  1. Great progress documenting the finishing stages of this project. Installing architraves, skirting boards, insulation, steel battens, and plasterboard really shows how every detail contributes to a quality result. I always enjoy seeing practical construction updates like these. Professional framing craftsmanship makes every finishing stage easier and more precise.